Contents
Leaving the neon of Susukino behind opens up the rest of Japan's northernmost island: the historic harbor of Hakodate in the south, the flower fields of Furano, the city of Asahikawa. Distances in Hokkaido are large, and the transition from city blocks to rolling hills happens quickly.
Highway buses and JR limited express trains link Sapporo with all of them. You can compare options and book on GoAsia.cc.
Sapporo to Hakodate by Bus
The Highway Hakodate Go is the budget way south. It is run by Hokkaido Chuo Bus and Hakodate Bus, needs a reservation, and covers the 327 km in about 5 hours 55 minutes with a rest stop at Usuzan Service Area. In the 2026 summer timetable buses leave Sapporo Station at 06:45, 09:40, 12:50 and 16:30, and the 09:40 and 12:50 services also call at New Chitose Airport.[1]

Fares run from 3,530 to 5,990 yen when booked online, and the buses have three-row individual seats, a restroom, free Wi-Fi, privacy curtains, slippers and footrests.[1]
Sapporo to Hakodate by Train
The Limited Express Hokuto runs between Sapporo and Hakodate with all seats reserved, and connects with the Hokkaido Shinkansen. The ride passes Mount Komagatake and Funka Bay.[2] It takes about 3.5 hours,[3] and the fare is 9,770 yen.[4]
Sapporo to Furano and Asahikawa
The Highway Furano Go leaves Sapporo Station seven times a day, from 08:50 to 18:40 in the summer 2026 timetable. It covers the 144 km in about 2 hours 55 minutes without a rest stop and costs 2,700 yen one way. The buses have a restroom, four-row reclining seats and free Wi-Fi.[5] For Asahikawa, take the Limited Express Kamui or Lilac. All seats are reserved, and you pay a reserved-seat limited express ticket on top of the basic fare.[6]
Sapporo to New Chitose Airport
Rapid trains run straight from Sapporo to New Chitose Airport in as little as 33 minutes, and IC cards such as Suica work on them.[7]
Comparing Your Options
| Route | Mode | Travel time | Fare |
|---|---|---|---|
| Sapporo to Hakodate | Highway Hakodate Go bus | About 5 h 55 min[1] | 3,530 - 5,990 yen |
| Sapporo to Hakodate | Limited Express Hokuto | About 3.5 hours[3] | 9,770 yen[4] |
| Sapporo to Furano | Highway Furano Go bus | About 2 h 55 min[5] | 2,700 yen |
Tips for Traveling from Sapporo Around Hokkaido
- Book ahead in peak seasons: The Snow Festival in February and the lavender season in summer fill buses and trains quickly.
- Reserve the Hakodate bus: Reservations open two months before boarding, and service can be suspended in snowstorms.[1]
- Dress warm: It can be sunny in Sapporo and much colder further north or east, so keep a jacket in your hand luggage.
- Stock up before long rides: Grab a bento box or snacks at Sapporo Station before the long trip south.
- Take a window seat south: Between Mount Komagatake and Funka Bay the views are the reward for the long ride to Hakodate.
Timetable
| Bus Sapporo - Hakodate $ 25.57–26.93 3h 48m – 5h 9m | |
|
| Taxi Sapporo - Hokkaido $ 194.71–208.03 1h 8m | |
|
Frequently Asked Questions
Use the booking tool on this page to compare the transport options currently available from Sapporo to Hokkaido, including current prices and schedules.
The Highway Hakodate Go bus is the budget option, with online fares from 3,530 to 5,990 yen. The train costs more at 9,770 yen.
To Hakodate the Limited Express Hokuto is fastest at about 3.5 hours, against about 5 hours 55 minutes by bus. New Chitose Airport is as little as 33 minutes away by rapid train.
The Limited Express Hokuto takes about 3.5 hours and the Highway Hakodate Go bus about 5 hours 55 minutes.
Yes. The Highway Furano Go leaves Sapporo Station up to seven times a day and takes about 2 hours 55 minutes. A one-way ticket costs 2,700 yen.
The Highway Hakodate Go requires a reservation, and every seat on the Limited Express Hokuto is reserved. Book early around holidays and the winter season.
The Hakodate and Furano highway buses both have a restroom and free Wi-Fi. The Hakodate buses also offer privacy curtains, slippers and footrests.
Sources and background
Numbers in the text such as [1] refer to these sources.
- [1] Hokkaido Chuo Bus: Highway Hakodate Go. Retrieved October 20, 2026.
- [2] Hokkaido Railway Company (JR Hokkaido): Trains bound for Hakodate: Limited Express Hokuto. Retrieved October 20, 2026.
- [3] Japan National Tourism Organization (JNTO): Sapporo & Around. Retrieved October 20, 2026.
- [4] Hokkaido Railway Company (JR Hokkaido): Regular Tickets. Retrieved October 20, 2026.
- [5] Hokkaido Chuo Bus: Highway Furano Go. Retrieved October 24, 2026.
- [6] Hokkaido Railway Company (JR Hokkaido): Trains bound for Asahikawa. Retrieved October 28, 2026.
- [7] Hokkaido Railway Company (JR Hokkaido): New Chitose Airport - Sapporo - Otaru. Retrieved October 28, 2026.
Guide prices and journey times are indicative, not live quotes. A booked package may include transfers and waiting time as well as the main journey. Check the selected offer, pickup point and current conditions before booking.
